2026 Compliance Window|🇦🇪 UAE Federal Climate Law:30 May 2026·🇪🇺 EU CSRD:FY2025 Filing·🇸🇬 SGX IFRS S2:FY2025 Mandate
One collection · four regulators

Four jurisdictions, one dataset.

EU CSRD, Singapore IFRS S2, UAE Federal Climate Law and California SB 253/261 each want their own format on their own deadline. Collect your emissions once — then project that single dataset into all four. Pick a regime to see who it covers and what its report must include.

🇦🇪UAE Federal Climate Law🇪🇺EU CSRD🇸🇬Singapore SGX · IFRS S2🇺🇸US · California SB 253/261
By regulation

Every deadline, side by side

Four regimes, four formats, four deadlines — all fed by the same collection. Open any one for who it applies to, exactly what the report must include, and a two-minute eligibility check.

Multi-Jurisdiction Projection Engine

One Single Dataset → Five Global Regulatory Exports

Click any jurisdiction below to watch how the same underlying activity data dynamically maps into that regulator's specific legal taxonomy.

🇦🇪

UAE Federal Climate Law

Upcoming Deadline

Cabinet Resolution No. 111/2024 · All legal entities

Deadline 30 May 2026
Assurance Level Ministry MRV Audit
Canonical Data Ingestion Go Pure Engine PipelineProjected Filing: AE Standard
1. RAW CANONICAL INPUT1 Single Store
Fuel (Diesel & Gas)11,500 L
Grid Power Meter245.8 MWh
Supplier Invoices14 Vendors
2. PURE CALC ENGINEv2025.2
• Applies UAE Factor Set
• Freezes calculation snapshot
• Generates SHA-256 evidence chain
3. AUDIT-READY EXPORT Verified
Scope 1 CoverageMandatory
Scope 2 CoverageMandatory
Scope 3 StatusVoluntary
Disclosure MetricRegulatory TagEmissionsConfidence TierAudit Status
Stationary Combustion (Diesel Gensets)UAE-MRV-S1-COM32.16 tCO₂eTier 1 (Measured)Audit Ready
Purchased Electricity (DEWA Dubai)UAE-MRV-S2-GRID105.00 tCO₂eTier 1 (Measured)Audit Ready
Refrigerant Losses (HFC-134a)UAE-MRV-S1-FUG4.82 tCO₂eTier 2 (Calculated)Verified
Looking for detailed statutory references and filing dates?Read the full UAE Federal Climate Law Guide

Every subscription covers all four jurisdictions — no per-report add-ons. Book a demo.

The projection model

The same data, four reports.

Underneath, all four laws ask for the same facts: what you emit directly, what your purchased energy emits, and what your supply chain emits — plus a plan to reduce it. ESG Orbit captures that once, then reformats it for each regulator instead of asking you to collect it four times.

  • Collect activity data once — Amount × Emission Factor, GHG-Protocol methodology across Scope 1, 2 and 3.
  • Every figure carries a confidence tier — Measured, Calculated or Estimated — and a link to its source evidence.
  • Each report is a projection of that one dataset into a regulator's format — never a fresh round of data collection.
  • Deadlines are settings, not code. When the UAE or California moves a date, it's a field to change, not a release to ship.
  • Switch on a framework and its report template appears in the builder — a toggle, not a re-implementation.
One emissions dataset
Scope 1 · 2 · 3 — each figure tiered and evidence-linked
projects into
EUSGAEUS
Change a deadline or add a framework? A setting, not a rebuild.
30-Second Compliance Diagnostic

Check Your Facility’s Legal Filing Readiness

Answer 4 quick questions to generate an instant statutory compliance roadmap and risk audit.

Step 1 of 4

Where are your manufacturing facilities located?

Select your primary operational geography or legal registration.

Conformant with the standards your auditors expect

GHG ProtocolEU CSRD / ESRSIFRS S2 (ISSB)UAE Federal Climate LawSingapore SGXCalifornia SB 253 / 261CBAMCDPSBTiTCFD

Your first 2026 deadline is closer than your data.

Collect once, comply everywhere. See ESG Orbit on your own facilities and suppliers — across all four jurisdictions from a single dataset.